Challenges for the executing trades
Documentation in plans:
- Transfer documentation from the construction site in a traceable manner to the technical system planners so that plan changes can be adopted accordingly
Creation of As-Built plans:
- Creation of As-Built plans at the end of the project based on handwritten documentation, especially for construction projects with long durations, is very time-consuming
Exchange of plans:
- Plan changes must be communicated to the construction site team and outdated plans withdrawn from circulation to prevent construction according to old plan versions
Distribution of plans on the construction site:
- Equip both own fitters and subcontractors always with the current plans and communicate relevant assembly instructions
The solution: Documentation of changes in CENDAS
💚
The plan revision process takes place completely digitally and in real-time with CENDAS. In this way, everyone works with the same, up-to-date plans throughout the entire project. In addition, as a technical system planner, you are spared the revision stress at the end of a construction site because you have already completed most of the work by then.
📚 Step-by-step instructions
Click on the individual steps to display a more detailed guide.
Benefits of using CENDAS
✅ Improved communication
✅ Digital and reliable documentation
✅ Clear responsibilities
✅ Better collaboration with external planning offices
✅ Filtering capability
How can I introduce the CENDAS.app on my construction site?
→ Mobile devices/Desktop
→ Plans in pdf/dxf format
→ Internet connection (to synchronize revision data with other devices, not required continuously as the app is also offline-capable)
First steps for introduction:
1. Create project
🔷 Create new project
2. Upload plans
🔷 Upload plans
3. Invite people
🔷 Invite users to CENDAS
4. Download app
🔷 Download app